LEED certification process

How Facility Managers Can Achieve LEED Certification for Their Buildings

LEED certification is a project, not an upgrade. For a facility manager, the work is mostly gathering proof that the building performs. HVAC sits at the center of that, because energy and indoor air quality both depend on it. This guide covers how to approach it, and what to check against the current guide, since LEED versions and credits change.

Choose the right rating system

LEED has different rating systems for different situations. New construction and major renovations use the building design and construction (BD+C) system. A building that is already operating normally uses the operations and maintenance (O+M) system. The U.S. Green Building Council publishes the current requirements at usgbc.org. Confirm which version your project must follow before you gather anything.

Where HVAC shows up

  • Energy performance. Prerequisites and credits ask for a minimum level of energy efficiency, and metering to prove it.
  • Commissioning. Building systems are verified to operate as intended. Here is how TAB and commissioning differ.
  • Refrigerant management. Limits on certain refrigerants and leak control.
  • Indoor air quality. A prerequisite sets minimum IAQ performance, and ventilation to the ASHRAE 62.1 standard is the usual way to meet it. Credits reward further measures.

Steps to get ready

  1. Do a gap review. Compare the building’s current performance and records to the prerequisites.
  2. Collect documents. Energy bills, equipment lists, design ventilation rates, maintenance records and test reports.
  3. Verify the systems. Outdoor air, airflow and controls should be measured and recorded, not assumed.
  4. Fix the gaps. Common ones are untested controls, missing records and ventilation rates that were never verified.
  5. Keep the performance period data. O+M certification looks at how the building operates over time.

How test and balance records help

A TAB report shows measured airflow, outdoor air quantities and fan data, so it supports the commissioning and ventilation documentation. See what a TAB report contains. A system that has never been balanced cannot show that it delivers design airflow, which weakens the case for credits that depend on it.

Questions facility managers ask about LEED

Do we need a consultant?

Many owners use a LEED professional to manage the submission, because the documentation is detailed. The facility team supplies the building data.

How long does it take?

It depends on the rating system, the building and how good the existing records are. A building with organized maintenance and test records moves faster.

Is LEED the same as meeting code?

No. Code is a legal minimum. LEED is a voluntary program that asks for performance beyond it, and for proof.

What to ask your HVAC contractor for

  • A current equipment list with nameplate data and age.
  • The design ventilation rate for each system, and the occupancy it assumed.
  • The latest TAB report, or a plan to produce one.
  • Control sequences of operation in writing.
  • Maintenance records for the last 12 months.
  • Refrigerant inventory and leak records for large systems.

Gaps that show up often in existing buildings

GapHow to close it
No record of measured outdoor airHave it measured and report it
Controls never verified against the sequenceFunctional test of each sequence
No energy metering by systemAdd or document metering where required
Missing maintenance historyStart a log now and keep it through the performance period
Design data lostReconstruct from nameplates, drawings and testing

Fixing these is useful whether or not you certify. They are the same things that cause comfort complaints and wasted energy.

Related reading: How Educational Institutions Can Achieve LEED Certification.

For measured airflow and outdoor air records that support your documentation, call Ghazi Hussain at (908) 323-9780.

Need Help?

Ghazi-Hussain-Air-Balance-Masters