Indoor air quality problems often start during construction. Dust in the ducts, wet insulation and fresh finishes that have not aired out all follow the building into occupancy. A general contractor controls most of this, and mostly through sequencing and protection.
What the GC controls
| Area | Practice |
|---|---|
| Ducts and equipment | Seal openings in storage and during installation |
| Filters | No permanent air handlers running without filters, and specified filters in at occupancy |
| Moisture | Keep porous materials dry, and fix leaks before finishes go on |
| Finishes | Choose low-emitting paints, adhesives, flooring and sealants where specified |
| Sequencing | Install absorbent materials after wet work has dried, and ventilate after finishes |
| Housekeeping | Clean as you go, and keep dust away from air intakes |
The sheet metal industry publishes guidelines for IAQ during construction. Ask the mechanical contractor which guideline the project follows, and make it part of the pre-construction meeting.
Before occupancy
- Replace construction filters with the specified filters.
- Clean ducts and air handlers where dust got in.
- Confirm outdoor air is delivered as designed. See the ventilation standards guide.
- Ventilate the building after finishes cure, if the project calls for a flush-out or an air test.
- Collect the documents: filter records, photos of protected ducts and the TAB report.
Occupied renovations
In an occupied building, the work must not send dust or fumes to people. Use barriers, keep the work area at negative pressure relative to the occupied area where practical, seal return openings and exhaust to the outdoors. In healthcare, an infection control risk assessment sets the rules. See the ICRA checklist.
Common mistakes
- Running the HVAC for temporary conditioning without filters. The dust ends up in the system.
- Installing carpet and ceiling tile before the building dries. They absorb moisture and odors.
- Treating IAQ as a punch-list item. It has to be built into the schedule.
Questions general contractors ask about IAQ
Who is responsible for IAQ during construction?
The GC coordinates it, and each trade is responsible for its own part, such as the mechanical contractor for the ducts.
Do we need to test the air before occupancy?
Only if the contract or a certification program requires it. When it does, follow the method it names.
What is the simplest improvement?
Cover the duct openings and use filters. It costs little, and its absence is expensive to fix. See installation choices that decide IAQ.
A simple construction IAQ plan
- Name the person responsible on site and on the mechanical contractor’s crew.
- List the protection measures: duct covers, filters, dry storage and cleaning routines.
- Set an inspection schedule, weekly for example, with photos.
- Record the filter type and change dates for any air handler that runs.
- Decide what test or flush-out the project requires before occupancy.
- File everything where it can be found at closeout.
A one-page plan, followed, is worth more than a long document that sits in a binder.
Related reading: How to Ensure Compliance with Air Quality Regulations in Construction and VOCs in Commercial Buildings: Sources and Control.
To verify ventilation before turnover, call Ghazi Hussain at (908) 323-9780 for a quote.
Related Posts
- The Importance of Collaboration Between Architects and HVAC Teams
- The Economic Benefits of Investing in Better Indoor Air Quality
- How to Choose the Best Air Purifier for Your Needs
- How to Ensure Compliance with Air Quality Regulations in Design
- Understanding the Impact of Air Balancing on Building Performance
- How Engineers Can Incorporate Smart HVAC Systems into Designs
- The Economic Benefits of Sustainable HVAC System Design
- How to Improve Air Circulation in Older Homes