HVAC retrofitting in older buildings

Key Considerations for Retrofitting HVAC Systems in Older Buildings

Replacing equipment in an older building is rarely a swap. The new unit meets old ducts, old controls and old assumptions. A short checklist before design can prevent the most expensive surprises.

Check these before design

  1. Recalculate the load. The building’s use, lighting and envelope have probably changed since the original design. Sizing from the old nameplate can leave you with a unit that is too large. An oversized unit cycles on and off, handles humidity poorly and wastes energy.
  2. Look at the envelope. Windows, roof and air leakage drive the load. Improving them first can let you install smaller equipment.
  3. Inspect the ducts. Check for leakage, damaged insulation, dampers that no longer work and sections that were changed over the years.
  4. Verify ventilation. Older buildings often bring in less outdoor air than today’s standards expect. See what the standards ask for.
  5. Survey for hazardous materials before disturbing anything. Older buildings may contain asbestos or lead-based paint, and the survey and abatement rules apply before work starts.
  6. Check electrical capacity for the new equipment, and the structural capacity of the roof or floor that will carry it.
  7. Review the controls. A new unit tied to obsolete controls can be difficult to set up.

Plan the work in an occupied building

  • Phase work by area, with temporary conditioning where needed.
  • Protect air quality during construction with barriers and clean-up, and in healthcare, use an infection control risk assessment. See the ICRA checklist for TAB teams.
  • Schedule shutdowns outside occupied hours where possible.

Test and balance after the retrofit

A retrofit changes airflow, pressure and outdoor air even when the new equipment is correct. Measure and balance the system before you accept it, and compare the results with the new design. Here are the key steps for TAB on retrofit projects.

Questions owners ask about retrofits

Should we replace all the ducts?

Not necessarily. Test them first. Sealing and repairing can be much cheaper than replacement, and the test shows how bad they really are.

Can we keep the old controls?

Sometimes. Confirm that the new equipment can communicate with them, and that someone supports them. Obsolete controls can be a hidden cost.

How do we know the retrofit worked?

Compare measured airflow, outdoor air and energy use before and after. A baseline taken before the work makes this easy.

Repair, partial replacement or full replacement

SituationUsual direction
Equipment works but ducts leak badlySeal and repair ducts, keep the equipment
Equipment failing and parts unavailableReplace the equipment, test the ducts before connecting
Comfort problems and old controlsUpgrade controls, then re-balance
Ventilation below current standardAdd or enlarge outdoor air path and verify
Envelope poorImprove the envelope first, then size equipment to the lower load

Common mistakes

  • Matching the old equipment size. The old unit may have been oversized, or the load may have changed.
  • Skipping a pre-retrofit test. Without it, you cannot show what the retrofit improved.
  • Forgetting the relief path. More outdoor air needs somewhere for building air to go.
  • Not budgeting for hidden conditions. Old buildings hide damaged ductwork, old insulation and undocumented changes.

Budget for the unknowns

Add a contingency line for hidden conditions, and a separate line for testing and balancing at the end. Both are small next to the cost of finding a problem after the ceiling is closed and the tenants are back in.

Related reading: How to Ensure Compliance with Air Quality Regulations in Construction and Improving Air Circulation in Older Commercial Buildings.

For a before-and-after measured baseline on your retrofit, call Ghazi Hussain at (908) 323-9780.

Need Help?

Ghazi-Hussain-Air-Balance-Masters