Testing produces a lot of numbers. A few of them tell you whether the system is healthy. This guide lists those, what each reveals, and how to read them against design.
The metrics that matter
| Metric | What it tells you |
|---|---|
| Airflow at each outlet, as a percentage of design | Whether each space gets the air it was designed for |
| Total airflow at the fan | Whether the system moves the design volume |
| Static pressure across filter, coil and fan | Where the system is restricted, and how hard the fan works |
| Fan speed (RPM) | Whether the fan runs where it was designed to run |
| Motor amps and voltage | Whether the motor is loaded as expected |
| Supply, return and mixed air temperature | Whether coils and controls are working |
| Outdoor air quantity or percentage | Whether ventilation meets design |
| Room pressure relationships | Whether air moves the intended direction |
| Water flow and pressure drop, on hydronic systems | Whether coils get their design flow |
How to read them
- Compare each reading with design. The number means little alone.
- Look at the tolerance in the spec. A common figure is plus or minus 10 percent of design, but check your own documents.
- Read the set together. High static pressure with low airflow points to a restriction. Low airflow with low pressure points to the fan or a leak.
- Record conditions. Note filter state, damper positions and any overrides at the time.
See what TAB measures and how to read the graphs in a TAB report.
Common mistakes
- Measuring only airflow. Pressure and amps explain why airflow is off.
- Taking one reading. Repeat and average where the flow is unsteady.
- Not recording conditions. A reading with a loaded filter is not a baseline.
Questions contractors ask about testing metrics
Which reading should I trust most?
Those taken with calibrated instruments by a method suited to the location, such as a traverse in a straight duct or a hood at an outlet.
What if readings are within tolerance but there are complaints?
Check the controls, the load and the thermostat. Airflow can be right while the room is still uncomfortable.
Where should I keep the numbers?
In the TAB report, and in the maintenance log as the baseline for later readings. See how to document maintenance.
A sample acceptance table
| Outlet | Design (cfm) | Measured (cfm) | Percent of design | Result |
|---|---|---|---|---|
| Format example only | Value from drawings | Value from hood | Measured divided by design | Within or outside tolerance |
Build the table for every outlet. Rows outside the tolerance become the deficiency list, and the rest become the proof that the system delivers.
How to present results to an owner
- Start with the headline: how many outlets are within tolerance.
- List the exceptions and what is being done about each.
- Show the fan data and static pressures in one summary page.
- State the outdoor air quantity against design.
- Give the owner the baseline to compare with in future years.
To have these metrics measured on your system, call Ghazi Hussain at (908) 323-9780 for a quote.
Related Posts
- The Importance of Staying Compliant with HVAC Industry Standards
- How to Choose the Best Air Purifier for Your Needs
- Understanding the Basics of Test, Adjust, and Balance (TAB) Services
- Understanding the Importance of TAB Report in HVAC Construction
- Top Tools Every HVAC Contractor Should Have for Air Balancing
- The Impact of Air Balancing on Classroom Comfort and Learning
- The Economic Benefits of Investing in Better Indoor Air Quality
- How Educational Institutions Can Improve Indoor Air Quality for Students









