Most HVAC problems on a job can be predicted at kickoff. A good set of questions brings them to the surface while there is still time. This list is grouped so you can use it in a meeting.
The questions, and what a good answer sounds like
| Question | A good answer |
|---|---|
| What exactly is in your scope, and what is not? | A specific list, with exclusions named |
| Which equipment has the longest lead time? | Named units with order dates |
| Who is the project manager and who is the foreman? | Names, with their other commitments |
| How will you coordinate above the ceiling? | A model or layout process, with meeting dates |
| When will the controls be programmed? | A date ahead of testing and balancing |
| Who tests and balances, and to what standard? | A named certified firm and the standard in the spec |
| What do you need from the other trades? | Specific dates and access points |
| What is in your closeout package? | A list of documents and a delivery date |
Schedule questions
- What are the startup dates for each air handler?
- How long will testing and balancing take, and what must be ready?
- How much time is built in for fixing deficiencies?
- Who runs the system for temporary conditioning?
For more on timing, see how to coordinate TAB with project deadlines.
Quality and closeout questions
- Which standard will you follow for duct sealing?
- How will you protect ducts and equipment during construction?
- Which tests will you perform and document?
- What will the owner receive at the end?
See what a certified balancer brings and how to select the right HVAC team.
What to do with the answers
- Write them in the kickoff minutes and circulate them.
- Turn each date into an item on the schedule.
- Assign each risk to a person.
- Revisit the list in two weeks.
Common mistakes
- Accepting vague answers. “We will handle it” is not a plan.
- Asking only the HVAC contractor. Ask controls and balancing too.
- Not writing it down. A discussion that is not minuted is forgotten.
Questions general contractors ask about kickoff meetings
How long should the HVAC kickoff take?
An hour or less if it is prepared. Send the questions in advance so people can come with answers.
Who should attend?
The GC’s project manager and superintendent, the HVAC project manager and foreman, the controls contractor and, if hired, the balancer.
What if answers conflict with the spec?
Raise it immediately and get a written response from the engineer.
A one-page version for the meeting
Print the table above, add a column for the date each answer is due, and bring it to the kickoff. At the end of the meeting, read the open items aloud and name the person who owns each one. Two minutes spent doing that turns a conversation into commitments, and gives you something to check at the next weekly meeting. Send the filled-in sheet to everyone who attended the same day, so memory does not drift.
Related reading: Top HVAC Installation Challenges Faced by General Contractors.
To bring a balancer into your kickoff, call Ghazi Hussain at (908) 323-9780.
Related Posts
- Top Tools Every HVAC Contractor Should Have for Air Balancing
- The Economic Benefits of Investing in Better Indoor Air Quality
- How General Contractors Can Address Indoor Air Quality Concerns
- The Link Between Building Design and HVAC System Performance
- How to Ensure Compliance with Air Quality Regulations in Construction
- Understanding the Basics of Test, Adjust, and Balance for Engineers
- The Importance of Air Balancing in Healthcare Environments
- How to Choose the Best Air Purifier for Your Needs