Preventative maintenance HVAC

Preventative HVAC Maintenance: A Working Program

Maintenance falls into three kinds, and most buildings use a mix without choosing one on purpose. Knowing the difference helps you decide where your time and budget should go.

Three kinds of maintenance

  • Reactive: fix it when it breaks. Cheap until the failure is a chiller in July.
  • Preventative: do scheduled tasks to reduce the chance of failure. Filters, belts, drains and calibration live here.
  • Predictive: use data, such as vibration, temperatures and amps, to decide when a part needs attention.

Most commercial buildings need preventative as the base, a little predictive on the biggest equipment, and an honest reactive budget for what slips through.

What a working program contains

  1. An asset list. Every unit, its location, model, age and what it serves.
  2. A task list per asset, taken from the manufacturer’s recommendations.
  3. A schedule, with someone named responsible for each task.
  4. Records of what was done, what was found and what was spent.
  5. A baseline. Starting readings, such as the TAB report, so you can see change over time.

The most common tasks are listed in our top 10 maintenance tips.

Numbers worth tracking

  • Scheduled tasks completed on time, as a percentage.
  • Emergency calls per month, and what caused each.
  • Comfort complaints per month, by area.
  • Energy use per month, compared with the same month last year.

If emergency calls fall while the first number rises, the program is working. If not, look at what the emergencies have in common.

Where it breaks down

Programs fail when tasks are not assigned, when records live in someone’s head, or when the schedule is never checked. Make one person responsible for the program and review it every quarter. Good records make the review quick.

A starter program for a small building

If you have nothing in place, begin with the equipment that causes the most trouble when it fails:

  1. List every air handler, rooftop unit, pump and exhaust fan.
  2. For each, copy the manufacturer’s maintenance tasks into a short sheet.
  3. Put the tasks on a calendar with a name against each.
  4. Take baseline readings once, and keep them.
  5. Review the list every quarter and add what you learned.

When to add predictive checks

Predictive maintenance pays on large or critical equipment: chillers, large fans and pumps, and anything where a failure shuts the building down. A simple start is to trend motor amps, vibration and bearing temperature. A reading that climbs over several months says a part is wearing, before it fails.

What good looks like after a year

  • Fewer emergency calls, and each one has a recorded cause.
  • No overdue tasks on the critical equipment.
  • Comfort complaints tracked by area, and falling.
  • A record you can show an owner, an insurer or an inspector.

Questions facility managers ask about preventative maintenance

How much should we spend on it?

There is no single right figure. Start with the manufacturers’ tasks for your equipment, cost them out, and track what each unit costs to keep running. The numbers show where money is well spent and where a unit is costing more than it is worth.

When is it time to replace instead of repair?

When repair costs on a unit keep rising, when parts are hard to get, or when its energy use is far above a new unit’s. Your maintenance records give you the evidence.

Who should own the program?

One named person. Programs drift when responsibility is shared and nobody checks it. That person reviews the schedule every quarter and reports the numbers above to whoever funds the work.

Related reading: How Machine Learning Predicts HVAC Failures.

For a measured baseline to anchor your program, call Ghazi Hussain at (908) 323-9780.

Need Help?

Ghazi-Hussain-Air-Balance-Masters