Building Performance Optimization

The Role of General Contractors in Optimizing Building Performance

A building performs as well as it was built and verified. The general contractor decides how the trades are sequenced, how the systems are protected and whether anyone checks the result. These choices matter more to long-term performance than most spec sections.

Where the GC affects performance

  • Sequencing. Systems are tested only if they are complete, and they are only complete if the schedule allows it.
  • Protection. Dust, moisture and damage during construction follow the building into occupancy.
  • Envelope. Air leakage and insulation set the load the HVAC system must meet.
  • Verification. Testing, balancing and commissioning prove the systems do what the design intended.
  • Handoff. Documents and training decide whether the owner can keep it running.

Verification, step by step

StepWho does itWhat it proves
StartupInstalling contractorEquipment runs
Test, adjust and balanceIndependent TAB firmAirflow and water flow meet design
Controls verificationControls contractor and commissioning agentSequences work as written
Functional performance testingCommissioning agentThe systems work together
Owner training and documentsAll tradesThe owner can operate and maintain the building

Read how TAB differs from commissioning and how air balancing affects building performance.

What to put in the schedule

  1. Startup dates for each air handler, with permanent power available.
  2. A controls programming milestone ahead of TAB.
  3. TAB duration based on the number of systems and outlets.
  4. Time to correct deficiencies and recheck.
  5. Functional testing after TAB, not alongside it.
  6. Owner training before substantial completion.

Common mistakes

  • Compressing the testing window. It is the first thing squeezed and the last thing the owner forgives.
  • Handing over documents in one box. Organize them so the owner’s staff can use them.
  • Letting changes go untracked. The design airflow is no longer the target once spaces change.

Questions general contractors ask about building performance

Who pays for the TAB and commissioning?

It depends on the contract. Often the owner funds them through the specification, and the GC coordinates. Confirm the scope at bid.

What is the single best thing a GC can do?

Protect the schedule for testing. A complete system and enough time to measure it is the base of everything else.

How does this connect to certifications like LEED?

Those programs ask for proof, and test reports are some of the proof. See the GC’s role in LEED.

How to protect the schedule for testing

Testing gets squeezed because it sits at the end, where every earlier delay lands. Two moves help. First, set the TAB date early and tie it to the milestones that must come before it, so a slip in controls or startup shows up as a slip in testing. Second, build in time for deficiencies, because most systems have some. A schedule that has no room to fix and recheck assumes the first test passes, which is rare on a complex system.

To plan testing and balancing on your next building, call Ghazi Hussain at (908) 323-9780.

Need Help?

Ghazi-Hussain-Air-Balance-Masters